Replacement of Unit No.1 DCS in Zouk Thermal Plant
Scope included dismantling of old system, adpation and cabling works in relay and control room. Supply of new system for a complete DCS for Unit No.1 ( turbine, boiler,regulation, electrical and common systems). New inverters, flame detectors and scanners were included in ET scope. Reverse engineering for replacement of old instrumentation by new instruments and overhaul of other existing instruments. In addition, Testing and commissioning of the new system is included in ET scope.. Client: EDL ; Completion: 2019
View all projects >
TALK TO AN EXPERT